Blog

Visualizer: An extraordinary view embedded in P6

We are all familiar with the old-fashioned but convenient way of presenting our activities in Primavera P6: Gantt charts. Options for shapes of bars, lines and milestones are limited. That is why eventually you can easily run out of options while presenting your activities. It even started to engrave its own visualising norms: bars are blue on left side of the data date and green on right side of the data date. It is time to add some richness to our Gantt chart elements.

Firat Tekilby Firat Tekil

Read more

Scheduling progressed activities

In this blog post, we’re going to dig deeper into a question you will face when preparing or reviewing a schedule update. How do you address “out-of-sequence” progress in Primavera P6?
The user has 3 interesting choices in the schedule options on how the software deals with progressed activities that are out of sequence, these choices are:

  • Retained logic
  • Progress override
  • Actual dates

This blog post will  address these 3 options, which will help you better represent reality in your progress updates.

Matthijs Warnezby Matthijs Warnez

Read more

Primavera P6 and the Longest Path

There is more to showing THE Critical Path in Primavera than your project manager can imagine. Primavera allows you to change certain settings to define the criticality of activities: you can define a threshold value for total float, or choose for the longest path instead of a total float-based critical path.

It is likely that you are interested in all activities that drive a certain milestone. And it makes much more sense to monitor the longest path towards this milestone instead of the critical path defined by total float. This very useful option is however a little bit hidden in Primavera P6 and I desperately want to share it with you! It is a method I use on EVERY SINGLE PROJECT.

Gert Truyensby Gert Truyens

Read more