Classic issues with layouts in Primavera P6

Posts Tagged ‘projecten kopiëren’

Classic issues with layouts in Primavera P6

Advanced Primavera P6, layout types, activity codes, copying projects

To provide the project team with the required insights in the project, a project controls engineer spends a good portion of his time filtering, sorting, scaling, summarizing, etc.  Thankfully most of this work doesn’t have to be repeated over and over again, as you can simply save layouts. Reapplying a layout is not only a gain of time, it also assures that your reports always look exactly the same. Or don’t they? Have your filters or group and sort settings ever disappeared, leaving you wondering where they went? Then this post will surely help you out.

Matthias van Campenby Matthias van Campen

Read more